News

How to install the DTH rig before use
2025/3/3

Drill rig installation and preparation before drilling


① 、Check whether the components and parts are missing and damaged after

the drill rig has been transported to the operating field. Install and add oil after

all are good. 

②、Put the front support leg of the mast into operation position and then adjust the

support leg(rod) to determine the angle of the mast.

③ 、 Air hose should be carefully cleaned before being connected to the air motor. Open the pipeline air valve for a few seconds and blow the impurities inside

the air hose with compressed air before connection. 

④ 、 Check whether all the bolts are tightened and all the pipelines are firmly

connected. Air and oil leakage are not allowed. 

⑤ 、Add suitable 32# machine oil into the atomized lubricator. 

⑥、All hand shanks of the pneumatic control valve are in the “off” position. 

⑦、After all preparation has been finished, conduct the test without load


Deutsch Espanol Francais Italiano Portugues Japanese Korean Arabic Russian

LiveChatX