一、Product features
1, the diesel engine is convenient to start, reduce the labor intensity of the operator.
2, the rig adopts hydraulic working principle, the drill can work with high efficiency.
3. The drilling rig has its own water pump, with reasonable structure, compact layout, and good slag discharge effect.
4, the configuration of the traction bar and wheel walking mechanism, the drill is convenient to move the field.
5. Configure silk support legs for rig leveling.
二、Instructions for use
1, site selection: select the location of the well, select the
position of the wellhead, with a shovel to dig deep 30-50cm,
diameter 10-30cm wellhead. Move the mounted frame to the alignment above the wellhead. Generally, the soil surface of the drilling
port should be dense, and there can be no bricks, gravel, firewood overhead phenomenon, so as to avoid water seepage, collapse,
subsidence and other phenomena in the process of drilling operation, resulting in hidden dangers.
2. Dig the reservoir: about four meters with a diameter more than
1.5 square meters and one meter away from the wellhead of the
actual terrain and the length of the water pipe), and hang the
pressure pump horizontally in the pool (cover the horizontal
surface over the pump) and connect the other end of the pump pipe with the faucet of the drilling machine.
3, boot: the drill pipe
link tightening, master machine hand shake machine rise head,
another person with drill pipe on the section, master machine hand shaking machine slow landing, head, another person with hand drill pipe slowly through the base drill hole into the drilling hole,
vertical upright, start the drill and water pump, drill rod rotation into the underground.
(Remember: the drill bit is clockwise, not inverted, so as not to cause the drill rod disconnection slide.)
4, on the drill pipe:
into the drill pipe, cooperate with people close buckle, plug in
the unloading card, the master machine hand reverse
counterclockwise rotation shaft, the lift head with drill shaft
separation, head, with another take a drill pipe, manually rotate on the top of the head, the lower joint docking, master hand on
clockwise rotate the drill pipe tightly, open the insurance card, remove the unloading card, boot clockwise rotation, continue to
drill. Repeat the above action repeatedly like this can be done. Find the ideal water-bearing geological sand layer according to your desired depth.
5. Remove the drill pipe: after drilling into
the water depth of the aquifer at the ideal depth, write down the
depth of the water-bearing sand layer, stop the drill, and only
open the pump pressurized water to flush the sand well. When there is no sediment in the well, the drill pipe can begin., Close the
safety buckle, plug in the unloading card, inverted transfer the
nose with the drill rod separation. Second, the loader shall press installed on the nose, tightening, landing nose will unload the
drill pipe on the base is into the groove, rotating buckle, when
the drill pipe bottom joint above the seat card stop, tight buckle, plug in the unloading card, reverse, the drill pipe automatically
unload, cooperate to take off, so repeated operation.
Note: When unloading the drill pipe with a drill bit, manually slowly put forward the base port to avoid touching.